GB/T 9652.2-2007
AbolishedTest code of control systems for hydraulic turbines
水轮机控制系统试验
Application Summary AI generated
This standard specifies the test methods, procedures, and acceptance criteria for control systems of hydraulic turbines, including governors, electro-hydraulic systems, and associated monitoring equipment. It is applied in the hydropower industry for factory acceptance, site commissioning, and routine maintenance testing of turbine control systems to verify performance, stability, and safety. The standard ensures consistent evaluation of control accuracy, response time, and fault handling across different turbine types and installation contexts.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.