GB/Z 32585-2016
ActiveGuide for model acceptance tests of 1000MW class francis hydraulic turbines
1000MW级混流式水轮机模型验收试验导则
Application Summary AI generated
This standard provides guidelines for conducting model acceptance tests on Francis hydraulic turbines designed for the 1000MW class. It is specifically applied in the hydropower industry to verify the performance, efficiency, and cavitation characteristics of turbine models before full-scale manufacturing and installation. The standard ensures that the model test results accurately represent the prototype turbine's behavior under specified operating conditions.
Related Standards
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
GB/Z 43465-2023
River energy resource assessment and characterization
GB/Z 37551.3-2024
Marine energy—Wave,tidal and other water current converters—Part 3: Measurement of mechanical loads
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.