GB/T 8564-2003
AbolishedSpecification installation of hydraulic turbine generator units
水轮发电机组安装技术规范
Application Summary AI generated
This standard specifies the technical requirements, installation procedures, and acceptance criteria for hydraulic turbine generator units in hydroelectric power plants. It is applied during the on-site assembly and commissioning of turbine-generator sets, covering components like the runner, shaft, bearings, and stator. The standard ensures operational safety and performance consistency in large-scale hydropower projects across China.
Related Standards
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
GB/Z 43465-2023
River energy resource assessment and characterization
GB/Z 37551.102-2024
Marine energy—Wave,tidal and other water current converters—Part 102: Wave energy converter power performance assessment at a second location using measured assessment data
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.