AbolishedTest acceptance codes of governors and pressure oil supply units for hydro-turbines
水轮机调速器与油压装置试验验收规程
Application Summary AI generated
This standard specifies the test methods, inspection rules, and acceptance criteria for governors and pressure oil supply units used in hydro-turbines. It is applied during factory testing, installation commissioning, and routine maintenance of hydropower plants to verify performance and reliability. The standard ensures that control systems meet operational safety and efficiency requirements in hydroelectric power generation.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.