GB/T 8564-2023
ActiveTechnical specification for installation of hydraulic turbine-generator unit
水轮发电机组安装技术规范
Application Summary AI generated
This standard specifies the technical requirements for the installation, inspection, and acceptance of hydraulic turbine-generator units, covering components such as the turbine, generator, governor, and excitation system. It is applied in the construction and commissioning of hydroelectric power plants, ensuring the mechanical and electrical integrity of the unit during assembly and startup. The standard is used by engineers and contractors for quality control and compliance verification in hydropower projects.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.