GB/T 44788-2024
ActiveTechnical requirements for grid-connected dispatching operation of solar thermal electric plants
太阳能光热发电站并网调度运行技术要求
Application Summary AI generated
This standard specifies the technical requirements for the grid-connected dispatch and operation of solar thermal electric plants, including power output control, ramp rate limits, and communication protocols with the grid operator. It is applied in China's power sector to ensure that concentrated solar power (CSP) stations can safely and stably integrate into the electrical grid, supporting dispatch commands and maintaining system reliability. The standard is relevant for plant operators, grid dispatchers, and equipment manufacturers involved in the design, testing, and daily operation of solar thermal power facilities.
Related Standards
NY/T 759-2003
Specification for pressure-resistant domestic solar water heater
NY/T 1146.1-2006
Solar energy PV generation system for household Part 1: Technical condition
GB/T 19393-2003
Rating of direct coupled photovoltaic(PV)--Pumping systems
GB/T 19394-2003
UV test for photovoltaic(PV)modules
GB/Z 40104.103-2023
Solar thermal electric plants—Part 1-3: General—Data format for meteorological data sets
GB/Z 45115-2024
Solar thermal electric plants—Characterization of active, sensible systems for direct and indirect configurations
GB/Z 46984.4-2026
Photovoltaic cells—Part 4: Measurement of light and elevated temperature induced degradation of crystalline silicon photovoltaic cells
GB/Z 117.101-2026
Photovoltaic modules—Test methods for the detection of potential-induced degradation—Part 1-1: Crystalline silicon—Delamination
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.