GB/T 43683.4-2025
ActiveGuidance for installation procedures and tolerances of hydroelectric machines—Part 4: Vertical Kaplan or propeller turbines
水轮发电机组安装程序与公差导则 第4部分:立式轴流转桨式或轴流定桨式水轮机
Application Summary AI generated
This standard provides specific installation procedures and tolerance requirements for vertical Kaplan (adjustable-blade) and propeller (fixed-blade) turbines used in hydroelectric power plants. It is applied during the on-site assembly and alignment of turbine components such as the runner, shaft, guide vanes, and draft tube to ensure proper hydraulic performance and mechanical reliability. The guidance is intended for engineers and technicians involved in the construction, commissioning, and quality inspection of medium-to-large hydropower stations.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.