GB/T 43683.3-2025
ActiveGuidance for installation procedures and tolerances of hydroelectric machines—Part 3:Vertical Francis turbines or pump-turbines
水轮发电机组安装程序与公差导则 第3部分:立式混流式水轮机或水泵水轮机
Application Summary AI generated
This standard provides specific installation procedures and tolerance requirements for vertical Francis turbines and pump-turbines used in hydroelectric power stations. It is applied during the on-site assembly and alignment of turbine components, such as the runner, shaft, and guide vanes, to ensure proper mechanical fit and operational efficiency. The standard serves as a technical reference for engineers and contractors involved in the construction, commissioning, or quality inspection of medium to large hydropower projects.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.