GB/T 43683.1-2024
ActiveGuidance for installation procedures and tolerances of hydroelectric machines—Part 1:General aspects
水轮发电机组安装程序与公差导则 第1部分:总则
Application Summary AI generated
This standard provides general guidance on installation procedures and acceptable tolerances for hydroelectric generating units, covering aspects such as alignment, assembly, and clearance verification. It is applied in the construction and commissioning of hydropower plants, serving as a technical reference for engineers and quality inspectors during the on-site installation of turbines and generators. The standard ensures consistency and reliability in the mechanical setup of hydroelectric machines across different project scales.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.