GB/T 43595-2023
ActiveDirectives for commissioning and operation of hydraulic turbines,pump-turbines and storage pumps
水轮机、水泵水轮机和蓄能泵启动试验及试运行导则
Application Summary AI generated
This standard provides technical guidelines for the commissioning, start-up testing, and trial operation of hydraulic turbines, pump-turbines, and storage pumps. It is applied in the hydropower industry to ensure the safe and reliable integration of new or refurbished hydroelectric units into power grids. The directives cover procedures for verifying equipment performance, control systems, and protection mechanisms before commercial operation.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.