GB/T 4091-2001
AbolishedShewhart control charts
常规控制图
Application Summary AI generated
GB/T 4091-2001 specifies the methodology for constructing and interpreting Shewhart control charts, which are statistical process control tools used to monitor and maintain process stability. It is applied in manufacturing and service industries to detect abnormal variations in production processes, enabling timely corrective actions. The standard is particularly relevant for quality control engineers and production teams in sectors like automotive, electronics, and food processing.
Related Standards
GB/T 2828.1-2012
Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
GB/T 19004-2011
Managing for the sustained success of an organization — Quality management approach
GB/T 19000-2008/ISO 9000:2005
Quality management systems - Fundamentals and vocabulary
GB/T 19011-2013
Guidelines for auditing management systems
GB/T 2828.1-2003
Sampling procedures for inspection by attributes--Part 1: Sampling schemes indexed by acceptance quality limit(AQL) for lot-by-lot inspection
GB/T 19022-2003
Measurement management systems--Requirements for measurement processes and measuring equipment
GB/T 6379.1-2004
Accuracy(trueness and precision)of measurement methods and results--Part 1:General principles and definitions
GB/T 6379.2-2004
Accuracy(trueness and precision)of measurement methods and results--Part 2:Basic method for the determination of repeatability and reproducibility of a standard measurement method
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.