GB/T 3925-1983

Abolished

Acceptance inspection of class 2 alternatingcurrent watthour meters

2.0级交流电度表的验收方法

Standard Type
GBT
ICS
19.080
CCS
N22
Status
Abolished
Issue Date
1983-11-08
Implementation
1984-10-01
Centralized Committee
中国机械工业联合会
Issuing Authority
中国机械工业联合会

Application Summary AI generated

This standard specifies the sampling plans and procedures for the acceptance inspection of class 2 alternating-current watthour meters. It is applied by manufacturers and utilities in China to determine whether a batch of newly produced or incoming meters meets specified accuracy and performance requirements before installation or use. The standard ensures consistent quality control in the electricity metering industry, particularly for residential and light commercial billing applications.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.