GB/T 18134.1-2000
AbolishedHigh-voltage testing techniques with very fast impulses--Part 1:Measuring systems for very fast front overvoltages generated in gas-insulated substations
极快速冲击高电压试验技术 第1部分:气体绝缘变电站中陡波前过电压用测量系统
Application Summary AI generated
This standard specifies the requirements for measuring systems used to capture very fast front overvoltages (VFFO) in gas-insulated substations (GIS). It is applied in high-voltage testing environments to ensure accurate measurement of steep-fronted transient overvoltages generated during switching operations or faults within GIS equipment. The standard is critical for validating insulation coordination and assessing the performance of GIS components under extreme transient conditions.
Related Standards
GB/T 7354-2003
Partial discharge measurements
GB/T 311.6-2005
Voltage measurement by means of standard air gaps
GB/T 16511-1996
Electrical and electronic measuring equipment--Documentation
GB/T 14537-1993
Shock and bump tests on measuringrelays and protection equipment
GB/T 7265.2-1987
Test method for the complex permittivity of solid dielectric materials at microwave frequencies--Open cavity method
GB/T 7265.1-1987
Test method for complex permittivity of solid dielectric materials at microwave frequencies--Perturbation method
GB/T 3929-1983
Standard cells
GB/T 3925-1983
Acceptance inspection of class 2 alternatingcurrent watthour meters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.