GB/T 37658-2019

Active

Code of start-up acceptance for photovoltaic power station

并网光伏电站启动验收技术规范

Standard Type
GBT
ICS
27.160
CCS
F12
Status
Active
Issue Date
2019-06-04
Implementation
2020-01-01
Centralized Committee
中国电力企业联合会
Issuing Authority
国家市场监督管理总局、中国国家标准化管理委员会

Application Summary AI generated

This standard specifies the technical conditions, procedures, and evaluation criteria for the start-up acceptance of grid-connected photovoltaic power stations. It is applied in China to ensure the safe and reliable integration of new solar plants into the electrical grid, covering pre-commissioning checks, system testing, and performance verification. The code is used by project developers, grid operators, and inspection agencies during the final commissioning phase before commercial operation.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.