GB/T 34818-2017
ActiveComputing methods of field water budget
农田水分盈亏量的计算方法
Application Summary AI generated
This standard specifies the calculation methods for field water budget, including formulas for determining precipitation, irrigation, evapotranspiration, and soil moisture changes. It is applied in agricultural water management, irrigation planning, and drought assessment for farmland in China. The standard supports engineers and procurement professionals in designing efficient irrigation systems and evaluating water resource allocation in crop production contexts.
Related Standards
GB/T 27992.1-2011
Water depth finding equipment--Part 1: Hydrologic sounding rod
GB/T 27993-2011
General technical conditions for stage measuring instruments
GB/T 27994-2011
General technical conditions for equipments of automatic system for hydrological data acquisition and transmission
GB/T 27991-2011
Fundamental technical requirements for sediment measurement and particle size analysis instrument in open channel
GB/T 19565-2004
Pyranometer
GB/T 19571-2004
Technical specification for the management of marine protected areas
GB/T 19705-2005
General specification of signals and interfaces for hydrologic instruments
GB/T 19704-2005
Display and record for hydrological instrument
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.