GB/T 19705-2005
AbolishedGeneral specification of signals and interfaces for hydrologic instruments
水文仪器信号与接口
Application Summary AI generated
This standard specifies the electrical signals, communication protocols, and physical interface requirements for hydrologic instruments such as water level gauges, flow meters, and rainfall sensors. It is applied in China's hydrological monitoring networks, water resource management systems, and flood early warning stations to ensure interoperability between instruments from different manufacturers. The standard facilitates reliable data transmission and system integration in both field-deployed and remote telemetry environments.
Related Standards
GB/T 27991-2011
Fundamental technical requirements for sediment measurement and particle size analysis instrument in open channel
GB/T 27992.1-2011
Water depth finding equipment--Part 1: Hydrologic sounding rod
GB/T 27994-2011
General technical conditions for equipments of automatic system for hydrological data acquisition and transmission
GB/T 27993-2011
General technical conditions for stage measuring instruments
GB/T 19565-2004
Pyranometer
GB/T 19571-2004
Technical specification for the management of marine protected areas
GB/T 19704-2005
Display and record for hydrological instrument
GB/T 19677-2005
Essential technical terms and symbols for hydrologic instrument
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.