GB/T 21440.1-2008

Active

Instument for dam monitoring settlement gauge - Part 1: Hydraulic overflow settlement gauge

大坝监测仪器 沉降仪 第1部分:水管式沉降仪

Standard Type
GBT
ICS
07.060
CCS
P10
Status
Active
Issue Date
2008-02-15
Implementation
2008-05-01
Centralized Committee
水利部
Issuing Authority
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

Application Summary AI generated

This standard specifies the technical requirements, test methods, and inspection rules for hydraulic overflow settlement gauges used in dam monitoring. It is applied in the construction and operation of hydraulic structures, such as concrete dams and embankment dams, to measure vertical displacement (settlement) of internal dam layers and foundations. The standard ensures accurate and reliable deformation monitoring for safety assessment and maintenance of large-scale water conservancy projects.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.