GB/T 19964-2024

Active

Technical requirements for connecting photovoltaic power station to power system

光伏发电站接入电力系统技术规定

Standard Type
GBT
ICS
27.160
CCS
F12
Status
Active
Issue Date
2024-03-15
Implementation
2024-03-15
Centralized Committee
中国电力企业联合会
Issuing Authority
国家市场监督管理总局 国家标准化管理委员会

Application Summary AI generated

This standard specifies the technical requirements for connecting photovoltaic power stations to the power system, covering aspects such as power quality, voltage and frequency regulation, and grid protection. It is applied in China to ensure the safe and stable integration of large-scale PV plants into the national grid, particularly for stations with capacities above 6 MW. The standard is used by grid operators, PV developers, and testing bodies during the design, commissioning, and operation of grid-connected solar farms.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.