GB/T 18482-2026
ActiveCode for startup and commissioning of reversible pumped storage units
可逆式抽水蓄能机组启动试运行规程
Application Summary AI generated
This standard specifies the technical procedures, safety requirements, and acceptance criteria for the startup and commissioning of reversible pumped storage units. It is applied in the hydropower industry during the initial operation phase of pumped storage power plants, ensuring that units are correctly synchronized, tested under load, and verified for grid stability before commercial service.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.