GB/T 17989.2-2020
ActiveControl charts—Part 2: Shewhart control charts
控制图 第2部分:常规控制图
Application Summary AI generated
This standard specifies the methodology for applying Shewhart control charts to monitor, control, and improve process performance by distinguishing between common cause and special cause variation. It is used in manufacturing, service, and industrial quality management contexts for real-time process monitoring, such as in production lines, batch processing, or transactional service operations. The standard applies to any process where measurable or attribute data is collected over time to detect shifts or trends requiring corrective action.
Related Standards
GB/T 2828.1-2012
Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
GB/T 19000-2008/ISO 9000:2005
Quality management systems - Fundamentals and vocabulary
GB/T 19011-2013
Guidelines for auditing management systems
GB/T 19004-2011
Managing for the sustained success of an organization — Quality management approach
GB/T 2828.1-2003
Sampling procedures for inspection by attributes--Part 1: Sampling schemes indexed by acceptance quality limit(AQL) for lot-by-lot inspection
GB/T 19022-2003
Measurement management systems--Requirements for measurement processes and measuring equipment
GB/T 6379.1-2004
Accuracy(trueness and precision)of measurement methods and results--Part 1:General principles and definitions
GB/T 6379.2-2004
Accuracy(trueness and precision)of measurement methods and results--Part 2:Basic method for the determination of repeatability and reproducibility of a standard measurement method
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.