GB/T 16507.5-2022
ActiveWater-tube boilers—Part 5: Fabrication
水管锅炉 第5部分:制造
Application Summary AI generated
This standard specifies the fabrication requirements for water-tube boilers, covering processes such as welding, heat treatment, assembly, and inspection. It is applied in the manufacturing of industrial and utility water-tube boilers in China, ensuring structural integrity and safety during production. The standard is used by boiler manufacturers and quality control personnel to guide and verify fabrication practices.
Related Standards
GB/T 27698.4-2011
Test method for the performance of heat exchangers and heat exchange element Part 4: Spiral heat exchanger
GB/T 27698.7-2011
Test method for the performance of heat exchangers and heat exchange element-- Part 7:Measurement of noise from air-cooled heat exchangers
GB/T 1921-2004
Parameters for industrial steam boilers
GB/T 3166-2004
Parameters for hot water boilers
GB/T 10180-2003
Thermal performance test code for industrial boilers
GB/T 5301-2002
Cinematography--Safe picture areas for motion-picture films for television--Position and dimensions
GB/T 12145-1999
Quality criterion of water and steam for generating unit and steam power equipment
GB/T 14811-1993
Heat pipe terminology
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.