GB/T 27698.4-2011

Abolished

Test method for the performance of heat exchangers and heat exchange element Part 4: Spiral heat exchanger

热交换器及传热元件性能测试方法 第4部分:螺旋板式热交换器

Standard Type
GBT
ICS
27.060.30
CCS
J75
Status
Abolished
Issue Date
2011-12-30
Implementation
2012-06-01
Centralized Committee
全国锅炉压力容器标准化技术委员会(SAC/TC 262) / National Boiler and Pressure Vessel Standardization Technical Committee (SAC/TC 262)
Issuing Authority
中华人民共和国国家质量监督检验检疫总局 / General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Catalogue

前言 → 1 范围 → 2 规范性引用文件 → 3 要求 → 3.1 样机设计数据与测试参数 → 3.2 测试程序 → 3.2.1 液-液无相变用热交换器 Foreword → 1 Scope → 2 Normative References → 3 Requirements → 3.1 Prototype design data and test parameters → 3.2 Test procedure → 3.2.1 Liquid-liquid non-phase change heat exchanger

Scope

This part of GB/T 27698 specifies the test methods for heat transfer and fluid resistance performance of spiral plate heat exchangers under test conditions of liquid-liquid non-phase change, vapor-liquid condensation with phase change, and vapor-liquid evaporation with phase change. This part is applicable to test fluids of liquid-liquid and steam-liquid. This part only considers the thermal conduction resistance of the heat transfer plate material, and does not consider the fouling resistance on both sides of the heat transfer plate.

GB/T 27698的本部分规定了螺旋板式热交换器液-液无相变 汽-液冷凝有相变 汽-液蒸发有相变 测试工况的传热和流体阻力性能测试方法。本部分适用的测试流体为液体-液体,蒸汽-液体。本部分只考虑传热板材料导热热阻,未考虑传热板两侧污垢热阻。

Normative References

GB/T 27698.1 JB/T 4751

Keywords

螺旋板式热交换器 (spiral heat exchanger) 传热性能 (heat transfer performance) 流体阻力 (fluid resistance) 测试方法 (test method) 无相变 (non-phase change) 有相变 (phase change) 液-液 (liquid-liquid) 蒸汽-液体 (steam-liquid)

Application Summary AI generated

Manufacturers and testing laboratories use this standard to verify the heat transfer efficiency and fluid resistance of spiral plate heat exchangers under liquid-liquid or steam-liquid conditions. It ensures reliability and energy performance in industrial applications, guiding equipment selection and quality assessment in chemical, petroleum, and energy sectors.

该标准主要用于螺旋板式热交换器的制造商和检测机构,用于验证产品在液-液、蒸汽-液体等工况下的传热效率和流体阻力性能。它确保了热交换器在实际应用中的可靠性和能效,对化工、石油、能源等行业的热交换设备选型和性能评估具有重要指导意义。

AI Summary AI generated

GB/T 27698.4-2011 specifies test methods for heat transfer and fluid resistance performance of spiral plate heat exchangers under liquid-liquid non-phase change, vapor-liquid condensation, and vapor-liquid evaporation conditions. It applies to liquid-liquid and steam-liquid test fluids, considering only the thermal conduction resistance of the plate material and ignoring fouling resistance. Before testing, the prototype, pipelines, and instruments must be checked for reliability. Design data and parameters shall follow GB/T 27698.1 and JB/T 4751. This standard provides a unified approach for performance evaluation of spiral heat exchangers.

GB/T 27698.4-2011规定了螺旋板式热交换器在液-液无相变、汽-液冷凝及蒸发有相变工况下的传热和流体阻力性能测试方法。标准适用于液体-液体和蒸汽-液体测试流体,仅考虑传热板材料导热热阻,忽略污垢热阻。测试前需检查样机、管线及仪表可靠性,设计数据与参数确定应参照GB/T 27698.1和JB/T 4751。该标准为螺旋板式热交换器的性能评估提供了统一方法。

Key Sentences extracted from text

1.

GB/T 27698的本部分规定了螺旋板式热交换器液-液无相变 汽-液冷凝有相变 汽-液蒸发有相变 测试工况的传热和流体阻力性能测试方法。

2.

本部分适用的测试流体为液体-液体,蒸汽-液体。

3.

本部分只考虑传热板材料导热热阻,未考虑传热板两侧污垢热阻。

4.

以上设计数据与测试参数其依据的确定方法与计算方法应按照 GB/T 27698.1和 JB/T 4751的要求进行。

5.

测试前,应检查测试样机,管线以及测量仪表的可靠性。

7.

This part of GB/T 27698 specifies the test methods for heat transfer and fluid resistance performance of spiral plate heat exchangers under test conditions of liquid-liquid non-phase change, vapor-liquid condensation with phase change, and vapor-liquid evaporation with phase change.

8.

This part is applicable to test fluids of liquid-liquid and steam-liquid.

9.

This part only considers the thermal conduction resistance of the heat transfer plate material, and does not consider the fouling resistance on both sides of the heat transfer plate.

10.

The determination methods and calculation methods for the above design data and test parameters shall be carried out in accordance with the requirements of GB/T 27698.1 and JB/T 4751.

11.

Before testing, the reliability of the test prototype, pipelines and measuring instruments shall be checked.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.