GB/T 15613.3-2008
AbolishedModel acceptance tests of hydraulic turbines, storage pumps and pump-turbine - Part 3: Additional performance test
水轮机、蓄能泵和水泵水轮机模型验收试验 第3部分:辅助性能试验
Application Summary AI generated
GB/T 15613.3-2008 specifies procedures for additional performance tests on scale models of hydraulic turbines, storage pumps, and pump-turbines, covering parameters like cavitation, pressure pulsations, and runaway speed beyond standard efficiency measurements. It is applied in hydropower plant design and procurement to validate model performance under off-design conditions, ensuring operational stability and safety before full-scale equipment manufacturing.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.