GB/T 10238-2015
ActiveOil well cement
油井水泥
Application Summary AI generated
GB/T 10238-2015 specifies the technical requirements, test methods, and inspection rules for oil well cement used in the petroleum and natural gas drilling industry. It applies to the production and quality control of cement intended for cementing operations in oil and gas wells, ensuring the material meets performance standards under high-temperature and high-pressure downhole conditions. This standard is critical for engineers and procurement professionals selecting cement for well construction, zonal isolation, and wellbore integrity.
Related Standards
JC/T 609-2011
Electric flow control valve for bulk cement equipment
JC/T 608-2011
Cement bulk loader for truck
JC/T 610-2011
Pneumatic switch valve for bulk cement equipment
GB/T 23265-2009
Chopped basalt fiber for cement, cement mortar and concrete
GB/T 19496-2004
Determinating of the compressive strength of spun high-strength concrete cores
GB/T 1345-2005
The test sieving method for fineness of cement
GB/T 12957-2005
Test method for activity of industrial waste slag used as addition to cement
GB/T 2015-2005
White Portland Cement
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.