GB 17621-1998
ActiveSpecification of reservoir operation for large and medium-scale hydropower stations
大中型水电站水库调度规范
Application Summary AI generated
This standard specifies the technical requirements for reservoir operation scheduling, including water level control, flood management, and power generation coordination, specifically for large and medium-scale hydropower stations in China. It is applied by hydropower plant operators and grid dispatch centers to ensure safe, efficient, and economical utilization of water resources while balancing flood control, irrigation, and ecological flow demands. The standard is mandatory for all newly built and existing hydropower stations with a reservoir capacity above a certain threshold, guiding daily operational decisions and long-term planning.
Related Standards
NY/T 845-2004
General technical qualification of generator for micro-hydro power generating equipments
GB/T 8564-2003
Specification installation of hydraulic turbine generator units
GB/Z 32585-2016
Guide for model acceptance tests of 1000MW class francis hydraulic turbines
GB/Z 32583-2016
Technical guideline for 1000MW class francis hydraulic turbines
GB/Z 35717-2017
Discharge measurement for hydraulic turbines, storage pumps and pump-turbines—Ultrasonic transit-time method
GB/Z 40295-2021
Power performance assessment of electricity producing wave energy converters
GB/Z 42153-2022
Code of practice of testing of pre-prototype devices of wave energy converters
GB/Z 43464-2023
Electrical power quality requirement of marine energy converters
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.