This standard specifies the evaluation methods, indicators, and procedures for assessing the operational performance of combined wind-photovoltaic-energy storage power stations. It is applied in the energy industry to benchmark and improve the efficiency, reliability, and economic viability of hybrid renewable energy systems integrating wind, solar, and battery storage. The code is used by power station operators, grid managers, and regulatory bodies for performance audits, compliance checks, and operational optimization.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35483-2017
Wind turbines—Production-based availability
GB/Z 35482-2017
Wind turbines—Time-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.