GB/Z 35483-2017
ActiveWind turbines—Production-based availability
风力发电机组 发电量可利用率
Application Summary AI generated
This standard specifies the calculation method for production-based availability of wind turbines, focusing on the ratio of actual energy output to theoretical energy output under defined conditions. It is applied in the wind energy industry for evaluating the operational performance and reliability of wind turbine generators, particularly in power purchase agreements and maintenance planning. The standard is used by manufacturers, operators, and grid operators to assess energy production efficiency and contractual compliance.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35482-2017
Wind turbines—Time-based availability
GB/Z 34541-2017
Safety operation management regulation for hydrogen fueling facilities of hydrogen vehicles
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.