GB/T 46813-2025

Upcoming

Guide of calculation for multiple renewable energy station short-circuit ratio

新能源多场站短路比计算导则

Standard Type
GBT
ICS
27.180
CCS
F 19
Status
Upcoming
Issue Date
2025-12-31
Implementation
2026-07-01
Centralized Committee
中国电力企业联合会
Issuing Authority
国家市场监督管理总局、国家标准化管理委员会

Application Summary AI generated

This standard provides a unified calculation method for the short-circuit ratio at multiple renewable energy stations, such as wind and solar farms, connected to a power grid. It is applied in the planning, design, and operation of large-scale renewable energy bases to assess voltage support strength and system stability. The guide is essential for grid operators and engineers in China to ensure safe integration of high-penetration renewable energy into the electrical network.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.