GB/T 46812-2025
ActiveTechnical specification for operation control of wind-photovoltaic-energy storage power station
风光储联合发电站运行控制技术规范
Application Summary AI generated
This standard specifies the operational control requirements for power stations that integrate wind, photovoltaic, and energy storage systems. It is applied in the design, commissioning, and daily operation of hybrid renewable energy plants to ensure grid stability, power quality, and efficient energy dispatch. The standard is primarily used by power station operators, grid management entities, and system integrators in China's renewable energy sector.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35483-2017
Wind turbines—Production-based availability
GB/Z 35482-2017
Wind turbines—Time-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.