ActiveWind energy generation systems—Desert and gobi wind turbines
风能发电系统 沙戈荒型风力发电机组
Application Summary AI generated
GB/T 46785-2025 specifies technical requirements for wind turbines designed to operate in desert and gobi environments, including sand resistance, temperature tolerance, and dust protection measures. It applies to wind energy generation systems installed in arid, sandy regions such as the Gobi Desert in China, ensuring reliable performance and durability under harsh conditions. This standard guides manufacturers, developers, and testing bodies in the design, production, and evaluation of turbines for these specific climatic contexts.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35483-2017
Wind turbines—Production-based availability
GB/Z 35482-2017
Wind turbines—Time-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.