Specification of operation and control for connecting electrochemical energy storage station to power grid

电化学储能电站接入电网运行控制规范

Standard Type
GBT
ICS
27.180
CCS
F19
Status
Active
Issue Date
2024-05-28
Implementation
2024-12-01
Centralized Committee
中国电力企业联合会
Issuing Authority
国家市场监督管理总局、国家标准化管理委员会

Application Summary AI generated

This standard specifies the operational and control requirements for connecting electrochemical energy storage stations to the power grid, covering grid-connected conditions, power regulation, reactive power control, and fault response. It is applied by grid operators, storage station developers, and system integrators in China to ensure safe, stable, and efficient integration of battery-based storage systems into utility-scale or distributed power networks. The standard is particularly relevant for compliance testing and operational management of storage stations participating in grid frequency regulation, peak shaving, or renewable energy smoothing.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.