Application Summary AI generated

This standard specifies the technical requirements, procedures, and acceptance criteria for the commissioning of electrochemical energy storage stations, covering system integration, performance testing, and safety verification. It is applied in China to guide the on-site testing and validation of large-scale battery storage facilities before they are connected to the power grid, ensuring operational reliability and compliance with national safety codes. The code is primarily used by engineers and project managers during the final construction and pre-operation phases of utility-scale or commercial energy storage projects.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.