GB/T 41585-2022

Active

Specification of draw-up commissioning program for pressurized water reactor nuclear power plants

压水堆核电厂调试大纲编写规范

Standard Type
GBT
ICS
27.120.20
CCS
F 63
Status
Active
Issue Date
2022-07-11
Implementation
2023-02-01
Centralized Committee
国家标准委
Issuing Authority
国家市场监督管理总局、国家标准化管理委员会

Application Summary AI generated

This standard specifies the content, format, and requirements for drafting a commissioning program for pressurized water reactor (PWR) nuclear power plants. It is applied by nuclear power plant operators and engineering teams to ensure systematic testing of systems, structures, and components before commercial operation. The standard provides a framework for safety verification and performance validation during the transition from construction to operational phases.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.