GB/T 41576-2022
ActiveRequirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
压水堆核电厂装料后机组性能试验要求
Application Summary AI generated
This standard specifies the technical requirements, test items, and acceptance criteria for unit performance tests conducted after the initial fuel loading in pressurized water reactor nuclear power plants. It is applied during the commissioning phase to verify that the reactor core, primary and secondary systems, and safety functions operate as designed under normal and transient conditions. The standard ensures the plant meets operational safety and performance benchmarks before entering commercial operation.
Related Standards
GB/T 11685-2003
Measurement procedures for semiconductor X-ray detector system and semiconductor X-ray energyspectrometers
GB/T 15146.11-2004
Nuclear criticality safety for fissile materials outside reactor--Nuclear criticalitysafety based on limiting and controlling moderators
GB/T 19597-2004
Safety requirements for decommissioning of nuclear facilities
GB/Z 109-2025
Guidance for nuclear power plant electrical power systems analysis
GB/Z 111-2025
Guide for selection and use of lead acid battery monitoring system in stationary applications of nuclear power plant
GB/T 11684-2003
Electromagnetic environment conditions and testing procedures for nuclear instrumentation
GB/T 17680.6-2003
Criteria for emergency planning and preparedness for nuclear power plants--On-site emergency response functions and organizations
GB/T 17680.7-2003
Criteria for emergency planning and preparedness for nuclear power plants--Function and physical characteristics of on-site emergency facilities
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.