Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants

压水堆核电厂装料后机组性能试验要求

Standard Type
GBT
ICS
27.120.20
CCS
F 63
Status
Active
Issue Date
2022-07-11
Implementation
2023-02-01
Centralized Committee
国家标准委
Issuing Authority
国家市场监督管理总局、国家标准化管理委员会

Application Summary AI generated

This standard specifies the technical requirements, test items, and acceptance criteria for unit performance tests conducted after the initial fuel loading in pressurized water reactor nuclear power plants. It is applied during the commissioning phase to verify that the reactor core, primary and secondary systems, and safety functions operate as designed under normal and transient conditions. The standard ensures the plant meets operational safety and performance benchmarks before entering commercial operation.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.