GB/T 39226-2020
ActiveRequirements on the integrated test for high power converter system of magnetic confinement fusion
磁约束聚变大电流变流系统集成测试要求
Application Summary AI generated
This standard specifies the integrated testing requirements for high-power converter systems used in magnetic confinement fusion devices, such as tokamaks. It covers test items, procedures, and acceptance criteria for verifying the system's electrical performance, protection functions, and operational reliability under fusion-specific pulsed power conditions. The standard is applied in the design, manufacturing, and commissioning phases of fusion energy research facilities.
Related Standards
GB/T 11685-2003
Measurement procedures for semiconductor X-ray detector system and semiconductor X-ray energyspectrometers
GB/T 15146.11-2004
Nuclear criticality safety for fissile materials outside reactor--Nuclear criticalitysafety based on limiting and controlling moderators
GB/T 19597-2004
Safety requirements for decommissioning of nuclear facilities
GB/Z 109-2025
Guidance for nuclear power plant electrical power systems analysis
GB/Z 111-2025
Guide for selection and use of lead acid battery monitoring system in stationary applications of nuclear power plant
GB/T 11684-2003
Electromagnetic environment conditions and testing procedures for nuclear instrumentation
GB/T 17680.6-2003
Criteria for emergency planning and preparedness for nuclear power plants--On-site emergency response functions and organizations
GB/T 17680.7-2003
Criteria for emergency planning and preparedness for nuclear power plants--Function and physical characteristics of on-site emergency facilities
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.