GB/T 36117-2018

Active

Guide for the planning and design of the rural photovoltaic power station cluster connected to power grid

村镇光伏发电站集群接入电网规划设计导则

Standard Type
GBT
ICS
27.160
CCS
F12
Status
Active
Issue Date
2018-03-15
Implementation
2018-10-01
Centralized Committee
中国电力企业联合会
Issuing Authority
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

Application Summary AI generated

This standard provides technical guidelines for the planning and design of clustered rural photovoltaic power stations connecting to the power grid, focusing on site selection, capacity configuration, and grid integration schemes. It is applied in rural areas of China to ensure stable and efficient grid connection for distributed solar projects, addressing challenges like voltage fluctuations and load balancing in weak grid environments. The guide supports engineers and planners in developing standardized, scalable PV clusters that align with local grid infrastructure and rural electrification goals.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.