GB/T 34133-2023
ActiveTesting code for power conversion system of energy storage system
储能变流器检测技术规程
Application Summary AI generated
This standard specifies the testing methods, procedures, and evaluation criteria for power conversion systems (PCS) used in electrochemical energy storage systems. It is applied in the manufacturing, commissioning, and grid integration of PCS units for utility-scale and distributed energy storage projects. The code ensures performance verification, safety compliance, and interoperability with power grids under various operating conditions.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35483-2017
Wind turbines—Production-based availability
GB/Z 35482-2017
Wind turbines—Time-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.