GB/T 33629-2024

Active

Wind energy generation systems—Lightning protection

风能发电系统 雷电防护

Standard Type
GBT
ICS
27.180
CCS
F11
Status
Active
Issue Date
2024-09-29
Implementation
2025-04-01
Centralized Committee
中国机械工业联合会
Issuing Authority
国家市场监督管理总局、国家标准化管理委员会

Application Summary AI generated

GB/T 33629-2024 specifies lightning protection requirements for wind energy generation systems, including turbines and associated electrical infrastructure. It is applied in the design, testing, and maintenance of onshore and offshore wind farms to mitigate damage from lightning strikes. The standard ensures operational safety and reliability by defining protective measures for blades, nacelles, and power transmission components.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.