GB/T 31519-2015
ActiveWind turbine generator system under typhoon condition
台风型风力发电机组
Application Summary AI generated
This standard specifies technical requirements for the design, testing, and operation of wind turbine generator systems capable of withstanding typhoon conditions. It is applied in coastal and offshore wind farms in China that are frequently exposed to tropical cyclones, ensuring turbine structural integrity and continued power generation during extreme wind events. The standard covers load calculations, control strategies, and safety validation for turbines rated for typhoon-prone environments.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35482-2017
Wind turbines—Time-based availability
GB/Z 35483-2017
Wind turbines—Production-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.