GB/T 30966.5-2015
AbolishedWind turbines—Communications for monitoring and control of wind power plants—Part 5: Conformance testing
风力发电机组 风力发电场监控系统通信 第5部分:一致性测试
Application Summary AI generated
This standard specifies conformance testing procedures for communication interfaces and protocols used in monitoring and control systems of wind power plants. It is applied to verify that wind turbine and plant control equipment comply with the IEC 61400-25 series, ensuring interoperability and reliable data exchange in wind farm SCADA systems. The standard is primarily used by wind turbine manufacturers, system integrators, and testing laboratories during equipment certification and commissioning.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 35483-2017
Wind turbines—Production-based availability
GB/Z 35482-2017
Wind turbines—Time-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.