GB/T 30966.4-2014

Abolished

Wind turbines―Communications for monitoring and control of wind power plants―Part 4: Mapping to communication profile

风力发电机组 风力发电场监控系统通信 第4部分:映射到通信规约

Standard Type
GBT
ICS
27.180
CCS
F11
Status
Abolished
Issue Date
2014-07-24
Implementation
2015-01-01
Centralized Committee
中国机械工业联合会
Issuing Authority
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

Application Summary AI generated

GB/T 30966.4-2014 specifies the mapping of wind power plant monitoring and control data models to specific communication protocols, such as IEC 61850. This standard is applied in the wind energy industry to ensure interoperability between wind turbines, SCADA systems, and grid control centers. It is used during system integration and testing to enable standardized data exchange for real-time monitoring and control of wind farm operations.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.