GB/T 28550-2012
ActivePiping verification requirement during nuclear power plant commissioning
核电厂调试阶段管道验证要求
Application Summary AI generated
This standard specifies the technical requirements for verifying piping systems during the commissioning phase of nuclear power plants. It is applied to ensure that installed piping meets design specifications, safety criteria, and operational integrity before the plant enters commercial operation. The standard is used by nuclear engineering teams and commissioning contractors to conduct pressure tests, leak checks, and dimensional inspections on safety-related and non-safety-related piping systems.
Related Standards
GB/T 11685-2003
Measurement procedures for semiconductor X-ray detector system and semiconductor X-ray energyspectrometers
GB/T 15146.11-2004
Nuclear criticality safety for fissile materials outside reactor--Nuclear criticalitysafety based on limiting and controlling moderators
GB/T 19597-2004
Safety requirements for decommissioning of nuclear facilities
GB/Z 109-2025
Guidance for nuclear power plant electrical power systems analysis
GB/Z 111-2025
Guide for selection and use of lead acid battery monitoring system in stationary applications of nuclear power plant
GB/T 11684-2003
Electromagnetic environment conditions and testing procedures for nuclear instrumentation
GB/T 17680.6-2003
Criteria for emergency planning and preparedness for nuclear power plants--On-site emergency response functions and organizations
GB/T 17680.7-2003
Criteria for emergency planning and preparedness for nuclear power plants--Function and physical characteristics of on-site emergency facilities
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.