GB/T 27933-2011
ActivePreliminary cost estimation of post-earthquake rehabilitation of engineering structures
震后恢复重建工程资金初评估
Application Summary AI generated
This standard provides a methodology for rapidly estimating the financial resources required for the rehabilitation of engineering structures following an earthquake. It is applied by Chinese government agencies, construction management departments, and insurance assessors to create preliminary budgets for restoring buildings, bridges, and other infrastructure in disaster-stricken areas. The standard is specifically used in the immediate post-earthquake assessment phase to guide funding allocation and reconstruction planning.
Related Standards
GB/T 18208.4-2005
Post-earthquake field works--Part 4: Assessment of direct loss
GB/T 19512-2004
Acoustics--Measurements on silencers in situ
GB/T 19513-2004
Acoustics--Measurement ofoffice screen sound attenuation under specific laboratory conditions
GB/T 19531.1-2004
Technical requirement for the observational environment of seismic stations--Part 1:Seismometry
GB/T 19531.2-2004
Technical requirement for the observational environment of seismic stations--Part 2:Electromagnetic observation
GB/T 19531.4-2004
Technical requirement for the observational environment of seismic stations--Part 4:Underground fluid observation
GB/T 19531.3-2004
Technical requirement for the observational environment of seismic stations--Part 3:Crustal deformation observation
GB/T 18207.2-2005
Terminology of protecting against and mitigating earthquake disasters--Part2:Special technical terms
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.