GB/T 25739-2010
ActiveTechnical guideline of valves commissioning for nuclear power plant
核电厂阀门调试技术导则
Application Summary AI generated
This standard provides technical guidelines for the commissioning of valves used in nuclear power plants, covering inspection, testing, and adjustment procedures to ensure proper functionality and safety. It is applied during the pre-operational and startup phases of nuclear power plant construction and operation, specifically for valves in primary and secondary coolant systems. The standard ensures that valve performance meets nuclear safety requirements before the plant enters commercial operation.
Related Standards
GB/T 11685-2003
Measurement procedures for semiconductor X-ray detector system and semiconductor X-ray energyspectrometers
GB/T 15146.11-2004
Nuclear criticality safety for fissile materials outside reactor--Nuclear criticalitysafety based on limiting and controlling moderators
GB/T 19597-2004
Safety requirements for decommissioning of nuclear facilities
GB/Z 109-2025
Guidance for nuclear power plant electrical power systems analysis
GB/Z 111-2025
Guide for selection and use of lead acid battery monitoring system in stationary applications of nuclear power plant
GB/T 11684-2003
Electromagnetic environment conditions and testing procedures for nuclear instrumentation
GB/T 17680.6-2003
Criteria for emergency planning and preparedness for nuclear power plants--On-site emergency response functions and organizations
GB/T 17680.7-2003
Criteria for emergency planning and preparedness for nuclear power plants--Function and physical characteristics of on-site emergency facilities
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.