GB/T 25385-2019
ActiveWind turbines—Operation and maintenance requirement
风力发电机组 运行及维护要求
Application Summary AI generated
This standard specifies the technical requirements for the operation, maintenance, and management of wind turbine generator systems. It is applied by wind farm operators and maintenance service providers to ensure safe, reliable, and efficient performance throughout the turbine's lifecycle. The standard covers procedures for routine inspections, fault handling, spare parts management, and documentation, serving as a guideline for both onshore and offshore wind power projects in China.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35482-2017
Wind turbines—Time-based availability
GB/Z 35483-2017
Wind turbines—Production-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.