GB/T 20719.13-2010
ActiveIndustrial automation system and integration - Process specification language - Part 13: Duration and ordering theories
工业自动化系统与集成 过程规范语言 第13部分:时序理论
Application Summary AI generated
This standard defines formal theories for representing durations and temporal ordering of activities within manufacturing processes. It is applied in industrial automation systems to enable unambiguous specification and reasoning about process sequences, timing constraints, and scheduling logic. The standard supports integration across design, simulation, and control systems in discrete manufacturing and process industries.
Related Standards
GB 24386-2009
Gear grinding machines-Safeguarding specifications
GB/T 19399-2003
Industrial robots--Graphical user interfaces for programming and operation of robots(GUI-R)
GB/T 19400-2003
Industrial robots--Object handling grasp-type grippers--Vocabulary and presentation of characteristics
GB/T 19662-2005
Industrial automation systems-Manufacturing Message Specification Terminology
GB/T 19660-2005
Industrial automation systems and integration-Numerical control of machines-Coordinate system and motion nomenclature
GB/T 16720.1-2005
Industrial automation systems-Manufacturing Message Specification-Part 1:Service definition
GB/T 16720.2-2005
Industrial automation systems-Manufacturing Message Specification-Part 2:Protocol specification
GB/T 19659.1-2005
Industrial automation systems and integration-Open systems application integration framework-Part 1:Generic reference description
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.