GB/T 19963.2-2024
ActiveTechnical specification for connecting wind power plant to power system—Part 2: Offshore wind power
风电场接入电力系统技术规定 第2部分:海上风电
Application Summary AI generated
This standard specifies the technical requirements for connecting offshore wind power plants to the power system, covering aspects such as power quality, grid adaptability, and control system performance. It is applied in the design, construction, and grid integration of offshore wind farms in China, ensuring stable and safe operation under various grid conditions. The standard is primarily used by wind farm developers, grid operators, and equipment manufacturers to comply with national grid connection regulations.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35483-2017
Wind turbines—Production-based availability
GB/Z 35482-2017
Wind turbines—Time-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.