Application Summary AI generated

This standard specifies the technical requirements for connecting geothermal power plants to the electrical power system, covering aspects such as grid interface, power quality, protection, and communication. It is applied in China to ensure the safe, stable, and efficient integration of geothermal power generation units into the national or regional power grid. The standard is used by power plant designers, grid operators, and equipment manufacturers during the planning, construction, and operation phases of geothermal energy projects.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.