GB/T 19568-2025
ActiveWind energy generation systems—Assembling and installation specification of wind turbines
风能发电系统 风力发电机组装配和安装规范
Application Summary AI generated
This standard specifies technical requirements for the assembly and installation of wind turbines, covering procedures for tower erection, nacelle and rotor assembly, and electrical system integration. It is applied in the onshore and offshore wind energy industry to ensure structural integrity, safety, and operational reliability during the construction phase of wind farms. The standard serves as a guideline for manufacturers, installation contractors, and project owners in China.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35482-2017
Wind turbines—Time-based availability
GB/Z 35483-2017
Wind turbines—Production-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.