GB/T 19568-2017
AbolishedWind turbines—Assembling and installation regulation
风力发电机组 装配和安装规范
Application Summary AI generated
This standard specifies the technical requirements, procedures, and acceptance criteria for the assembly and on-site installation of wind turbine generator systems. It is applied by wind farm developers, turbine manufacturers, and construction contractors during the erection of utility-scale wind turbines, covering tasks such as tower assembly, nacelle mounting, rotor installation, and electrical connections. The regulation ensures structural integrity, operational safety, and performance consistency across wind power projects in China.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35482-2017
Wind turbines—Time-based availability
GB/Z 35483-2017
Wind turbines—Production-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.